Market · 5 Projects
Labs and Research
Lab specialty gas, process piping, compressed air, RO/DI water, and chemical waste and vent.



Copper lines to a fume hood 
Vacuum, air, and nitrogen drops 
Helium lines down the wall
Typical Scope
- Nitrogen, helium, hydrogen, and CO2 lines
- Compressed air piping
- RO/DI water and process piping
- Acid waste and vent
- Emergency eyewash and safety showers
- Lab sinks and fume hood connections
- Vacuum and specialty drains
Projects
- Livermore2026Lab sinks, restrooms, and rooftop gas lines
- San Leandro2026Lab sinks on 2 floors, grease interceptor
- Berkeley2026DI water piping to an analyzer
- Berkeley2026Fume hood and compressed air piping moved
- Fremont2025Nitrogen, clean dry air, and vacuum lines
Services


Have a Set of Plans?
Upload, link, or email. We confirm within one business day.

